Skip to content

09 Life Residences construction photos

11 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of 09 Life Residences was built on the day of each visit.

26 August 20266.8% built

1 June 20265.5% built

17 December 20252.4% built

Back to 09 Life Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.