Skip to content

Mayfair Nexus By Seven Mayfair construction photos

5 photos taken by Dubai Land Department engineers at 2 site inspections, newest first. The percentage is how much of Mayfair Nexus By Seven Mayfair was built on the day of each visit.

25 March 20260.6% built

9 December 20240% built

Back to Mayfair Nexus By Seven Mayfair construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.